Building Materials & Construction Quiz


Here is a sample quiz on Building Technology (Materials and Methods of Construction) which is given in the afternoon session of Day 1 board examinations (see scope of subject below this post). Some questions in the recent board exams given in Day 1 are included in this compilation of more than 700+ questions. Try this quiz as part of your review.

There are 25 questions in this Quiz. You may repeat the quiz by refreshing your browser and different questions will appear.. Enjoy!!!

Password: atlascped



To learn more, enroll in our Architecture Board Exams Review Courses. Click HERE for details.


Try other Arki Quizzes HERE

BUILDING MATERIALS , ARCHITECTURAL SPECIFICATIONS  AND METHODS OF CONSTRUCTION

A. Rationale and Description
1. Understanding of the properties of building construction and finishing materials; their application and articulation; systems and methods of specifying and construction;
2. Awareness of the different types/ formats of architectural specifications and presentations i.e. specifications brief, outline specifications, specifications matrix, technical specifications, schedules of finishes/ fenestrations (doors and windows)/ fixtures (sanitary, electrical, etc.)/ furniture (assembled, custom, etc.)/ equipment/ hardware, etc. ;
3.    Understanding of the types of con¬struction systems and methods; and
4. Application of certain management principles relative to the realization of the various stages of construction (including pre-construction and post-construction)

B.  Terminal Competencies for LEA Candidates
1. Ability to promote awareness and to apply in practice the principles of public safety through the correct specification and application of construction and finishing materials;
2. Ability to utilize the basic properties and compositions of construction and finishing materials, including their basic application and articulation for the building envelope;
3. Ability to specify appropriate building materials considering their applicability, practicability and functionality and in accordance with the standard and uniform system of architectural and/ or building specification e.g. Masterformat, etc.;
4. Ability to expresses the language of building materials, both in English and the vernacular e.g. Filipino, as used in the construction and design industries;
5. Ability to apply the essentials of architectural specification writing in identifying, recommending and using the appropriate type of materials for a particular building situation and/ or condition;
6. Ability to utilize architectural specifications as non-graphical tool to fully complement architectural working drawings;
7. Ability to promote awareness and to apply in practice the principles of public safety through systems and methods of construction;
8. Ability to describe the essentials of working drawing production through the language of graphical presentation;
9. Ability to translate conceptual architectural designs into architectural working drawings;
10. Ability to do detailing for architectural working drawings;
11. Ability to apply methods and techniques in the production of construction drawings/ documents for the construction, erection or assembly of a building/ structure;
12. Ability to describe essential concepts and principles relative to construction, erection, assembly and fabrication of various types of common buildings;
13. Ability to apply the different methods and techniques of estimating different quantities of materials, equipment and labor for use as a basis for sound project programming, scheduling and control;
14. Ability to describe the fundamental principles governing the design, purpose and application of the different types of non-conventional systems of construction and the advantages of using such systems;
15. Ability to provide some architectural working details for the various types of alternative building construction systems and components;
16. Ability to describe the latest system/s available in the construction industry; and
17. Ability to comprehend tender and construction documents and to understand the basic functions and legal importance of such documents.

C. Scope
The applicable architectural specifications for the following conventional and alternative building works:
a. Non-engineering civil works;
b. Carpentry and joinery;
Concrete and masonry;
d. Various metal works;
e. Structural steel for architectural applications;
f. Concrete and reinforced concrete for architectural applications;
g. Waterproofing, damp-roofing, insulation and the like;
h. Glass and glazing;
i. Painting and varnishing;
j. Doors, Windows and Other Fenestrations;
k. Hardware; and
1. Specialty works (pre-fabrication, vaults, signage, parking systems, etc.)

           The methods of construction for the following conventional and alternative building works:
a. Non-engineering civil works;
b. Carpentry and joinery;
c. Concrete and masonry;
d. Various metal works;
e. Structural steel for architectural applications;
f. Concrete and reinforced concrete for architectural applications;
g. Waterproofing, damp-roofing, sound and thermal insulation and the like;
h. Glass and glazing;
i. Painting and varnishing;
j. Doors, Windows and Other Fenestrations;
k. Hardware; and
1. Specialty works (pre-fabrication, vaults, signage, parking systems, etc.)


11 comments:

  1. A form of brick bond in which each course is alternately composed of entirely of headers or of stretchers is known as ...
    A. flemish bond (correct answer)
    B. english bond (your answer)
    C. plaster bond
    D. common bond

    ndi b englih bond sagot d2?..alternate course=english bond
    alternate in each course =flemish bond,..db po?

    ReplyDelete
  2. The term used to describe the putting up of the skeleton of the building

    A. Shell Works (Correct Answer)
    B. Roughing-in
    C. Layout
    D. Formworks

    Sir tanong ko lng bakit shell works?

    ReplyDelete
    Replies
    1. kung sino ka man sumagot ng shell works, mali ka!!!

      Delete
  3. A preformed ribbon of synthetic rubber used in glazing to form a watertight seal between glass and frame.
    A. Structural Tape
    B. Cap Bead (correct answer)
    C. Putty
    D. Glazing Tape (your answer)

    sir please try to verify the answer..i think the answer here also is gasket?tnx..

    ReplyDelete
  4. Wood connectors are efficient when

    A. perpendicular to the grain (Your Answer)
    B. embossed along the grain
    C. tied around the wood section
    D. parallel to the grain (Correct Answer)


    sir bakit po parallel?? sabi ni sir jeje perpendicular

    ReplyDelete
  5. Wood connectors are efficient when

    A. perpendicular to the grain (Your Answer)
    B. embossed along the grain
    C. tied around the wood section
    D. parallel to the grain (Correct Answer)


    perpedicular pag sa pag cut ng wood

    ReplyDelete
  6. A form of brick bond in which each course is alternately composed of entirely of headers or of stretchers is known as ...
    A. plaster bond
    B. common bond
    C. english bond (your answer)
    D. flemish bond (correct answer)

    pakitagalog nga po yung tanong? peace!
    "in which each course is alternately composed of entirely of headers OR of stretchers is known as"
    hinde oh ba dapat " AND " yung gamitin dun imbes na "OR"
    naguluhan lang po, sensya na!

    ReplyDelete
  7. A Howe Truss is being considered to support the roofing system of a residential building. The pitch of the truss is 1 vertical 3 horizontal. What is the total length of the top chord, if the span of truss is 12 meters and the eave is 1.5 meters horizontally?

    A. 7.567 meters
    B. 7.555 meters
    C. 7.906 meters (Your Answer)Correct
    D. 7.675 meters

    paano 'to i-solve? hehe.. hinulaan ko lng kasi.. --,

    ReplyDelete
    Replies
    1. Simple use Ratio Proportion to solve this problem:
      Hint: Use only one side of the truss, better divide it into 2.
      Divide 12.00 meters span into 2 parts it will give you 6.00 meters. So now focus on the Right triangle as you draw then. using the vertical 1 and horizontal 3.

      1*3 = x*6
      Let x = height of the truss

      so, x = 6/3 = 2
      Height of Main Truss (King post) = 2.oo meters

      Now Focus on the Eaves given 1.50 meters
      Still use Ratio Proportion;

      1*3 = y*2
      Let y = be the height of the vertical part adjacent to the length of eave.

      So y = 1.5/3 = 0.50 meters

      The upon solving the 2 Triangles:

      Triangle 1:
      Given Span = 6.00 meters
      Height is 2:00 meters
      Now solve for the Diagonal Span of roof (Sp1)

      Use Pythagorean Theorem:
      C = /(a*a) + (b*b)
      Let c = Sp1
      Sp1 (c)= / (2*2)+(6*6)
      Sp1 = /4 + 36
      Sp1 = 6.32 meters

      Triangle 2:
      Given Span = 1.50 meters (Eaves)
      Height: 0.50 meters

      Use Pyhthagorean Theorem
      Let c = Sp2
      Sp2 (c) = /(0.5*0.5) + (1.5*1.5)
      Sp2 = /0.25 + 2.25
      Sp2 = /2.5
      Sp2 = 1.58

      Than Add or sum up the two Sp1 + Sp2
      Final Answer : 6.32 meters + 1.58 meters
      Total Span of the Roof = 7.901 meters (closer to answer 7.906 meters)

      Hint: Better draw and substitute all the given value so it will be more easy for you to understand. Good luck! Mabuhay ang Arkitektong Pilipino! :)


      Delete
  8. aldwin genzon and rockstell alerta tops again

    ReplyDelete
  9. Sa nakaraang Architecture Licensure Examination June 7 & 9, 2013, maraming lumabas na questions sa History and Theory of Architecture dito sa website na to, basahin nyo lng po eto at makakatulong sa pag eexams nyo for the future. Thank you so much po sa UAP-CCD

    ReplyDelete

 