Sample Text

Sunday, August 14, 2011

Profprac Quiz 1


Here is a sample quiz for Professional Practice (RA 9266, Code of Ethics, SPP Documents, Architects Guidelines, General Conditions, Contract Documents, Global Practice) which is given in the morning of Day 1 as well as in Day 2 (Design Exam) of the Architects Licensure Examination. Try this quizzes as part of your review.

There are 15 questions in this Quiz. You may repeat the quiz by refreshing your browser and different questions will appear.. Enjoy!!!

PASSWORD: atlascped


To learn more, enrol in our Architecture Board Exams Review Courses. Click HERE for details.

Try other Arki Quizzes HERE

17 comments:

  1. Structures belonging to Group 1 i. Hangars iii. Packaging & Processing Plants ii. Industrial Plants iv. Supermarket
    A. i, ii & iii (your answer)
    B. ii, iii & iv
    C. i, iii & iv
    D. i, ii & iv (correct answer)

    -hellow mam/sir,
    paki check naman po itong question na ito, check ko kasi sa uap doc 201. pre-design services yung SUPERMARKET along GROUP 2 siya, at yung iba GROUP 1 na..paki check naman po ..thanks ng marami.

    ReplyDelete
  2. How many sets of plan are to be given/submitted to the owner?

    A. 4
    B. 5 (Your Answer)
    C. 6
    D. 7 (Correct Answer)

    confirm ko lng po di ba 5 sets lang ng drawing ang ibibigay sa owner.... salamat po.

    ReplyDelete
  3. 2.4 Contract Document Phase

    Based on the approved Design Development Documents, the Architect:

    2.4.1 prepares the complete Contract Documents consisting of detailed designs and construction drawings, setting forth in detail the work required for the architectural, structural, electrical, plumbing/ sanitary, mechanical, electronic and communication works prepared by the Architect and the respective professionals involved.

    2.4.2 prepares Technical Specifications describing type and quality of materials, finish, manner of construction and the general conditions under which the project is to be constructed.

    2.4.3 submits to the Owner seven (7) sets of all construction drawings and technical specifications for purposes of obtaining a building permit.

    2.4.4 updates the SPPCC based on changes in scope, requirements or market conditions.

    2.4.5 assists the Owner in filing the required documents to secure approval of government authorities having jurisdiction over the design of the Project.

    ReplyDelete
  4. An Architect is employed in a certain government agency. The head of the agency decided to commission the agency Architect to prepare the designs and documents for an office building intended to house the regional office of the said agency. The Architect receives an annual compensation of P450,000.00. If the professional fee for the Architect is pegged at 7% of the Project Construction Cost, how much should the Architect ask from the agency for additional compensation for the said project? The construction cost for the said regional office building is P50 million.
    A. P52,500.00 (correct answer)
    B. Nothing
    C. P3,500,000.00
    D. P450,000.00

    sir ask ko lang po paano nakuha yung P52,500.00... more power po

    ReplyDelete
  5. Who will be liable for seeking and soliciting architectural works by a non registered person?
    A. the employer and the employee
    B. both the represented and the representative
    C. None of the above
    D. All of the Above (correct answer)

    Ibig sabihin kasama pati C?

    ReplyDelete
  6. When the Owner fails to implement the plans and documents for construction as prepared by the Architect, the Architect is entitled to receive as compensation the sum corresponding to ___ (%) percent of the Architect’s fee.

    A.80
    B.85
    C.90 (Correct Answer)
    D.95

    D po ba dapat ang sagot is 85% kci ung 15% Which is 5% supervision and 10% architects liabilities un lng ung mga d natuloy sa project.


    Who determines time and cost for the project?
    A. Project Manager
    B. Contractor
    C. Construction Manager
    D. Owner (your answer)

    D po ba dapat ung architect ung nagdedetermine kung kelan matatapos at kung magkano ung magiging kabayaran sa project?

    ReplyDelete
    Replies
    1. OLD SPP yung 85% sir. Ung new SPP kc 90%.

      Delete
  7. Good day po

    An Architect is employed in a certain government agency. The head of the agency decided to commission the agency Architect to prepare the designs and documents for an office building intended to house the regional office of the said agency. The Architect receives an annual compensation of P450,000.00. If the professional fee for the Architect is pegged at 7% of the Project Construction Cost, how much should the Architect ask from the agency for additional compensation for the said project? The construction cost for the said regional office building is P50 million.
    A. P52,500.00 (correct answer)
    B. Nothing
    C. P3,500,000.00
    D. P450,000.00

    hi sir, ask lang poh,papanu po nakuha ang 52,500 Php? thak you po..

    ReplyDelete
  8. Tama po yung 90% base on the new spp. Sa regular design services.. if work is abandoned or suspended.....

    ReplyDelete
  9. some of the questions are changing it's answer? why? and how would we know if it is the final answer?

    ReplyDelete
  10. what question? pls. provide info so we can correct any mistake. thanks.

    ReplyDelete
  11. I thinks its better kung nakalagay if sa questions if it its based on the new or old SPP,

    ReplyDelete
  12. kindly show the computation on how the 52,500 derived. Based on RA 9266 sec 35, incentive is 1.5% of Project construction cost and shall not exceed more than 50% of his annual salary.

    This is my interpretation.

    PCC is 50,000,000 x 1.5% x 7%

    question. why is it also multiplied by 7% and not just 1.5% only? is it because it exceed the 50% of his annual salary?

    ReplyDelete
  13. P50,000,000.00 x 7% = P3,500,000.00
    1.5% of P3,500,000.00 = P52,500.00

    ReplyDelete
  14. Under Pre-Design Services, the cost of printing of extra set of drawings, reports, maps, contract documents, etc. over the ____ copies submitted to the Client, overseas and long distance calls, terhnical and laboratory tests, licenses, fees, taxes and similar cost items needed by the Project are chargeable to the Client.

    answer is 5 SETS

    Before there are 5 sets of Contract Documents
    but Fire Code of the Philippines is revised then 5 sets become 7 sets.

    hindi ba 7 SETS po ang sagot? please clarify my querry?

    Thank You UAP-CCD

    ReplyDelete
  15. Rabin,
    Question is "Under PRE-DESIGN Services". Please read SPP Doc 201 Pre-Design Services. 5 copies is the answer.

    Iba ung ang sa Regular Design Services (7 sets), iba sa NBC (5 sets), at iba sa Fire Code (6 sets).

    ReplyDelete

 
Design by Free WordPress Themes | Bloggerized by Lasantha - Premium Blogger Themes | cheap international calls